• Personnel training, service and quality assurance
•Personnel training
PUCKAC will carry out two aspects of training on users during the construction
-Field training
During the construction, PUCKAC will deliver professional engineers for site operation and invite project management to carry out field construction and the explanation, including cabling direction, considerations during the cabling, cabling specifications and principles
-User operation, application and management training while the acceptance is qualified and it is put into operation
After project acceptance, PUCKAC will send professional engineers to have a strict training on users, including routine use, management, maintenance and other considerations.
Service maintenance
After system engineering is qualified upon the acceptance, PUCAKC is responsible for free maintenance for one year
Due to the quality issue of system devices in Premises Distribution System, PUCAKC is responsible for free replacement; the responsive time of the service is 24 hours
Due to device damage caused by the proper use or management, PUCKAC will provide the change and maintenance services for relevant devices and components on a paid basis.
-Quality assurance
According to PUCKAC’s quality assurance system, the cabling system must adopt point-to-point original PUCKAC’s products, be designed, constructed, installed by special engineers. Under this condition, line fault and other issues caused by PUCKAC’s material quality in the following 25 years will be freely replaced by appointed systematic integrators, and PUCKAC will ensure that the cabling system meets future growth requirements.
|